Dramatic plans for California’s longest-ever tunnel revealed — as $3.5B project poised for beauty spot
· nypost.com · popularity 14/100 · 0 similar stories today
Read the original at nypost.com →
Summary
The tunnel’s final design work, property acquisition, and environmental permitting will continue from 2026 through 2031.
Found in: New York Post. Rating basis: single outlet; outlet tier 2 (unlisted); 1 feeds; feed position 23.